DYWIDAG Post-Tensioning System for repairs and improvements to a bridge deckNew prestressed concrete deck stabs for the Jacques Cartier Bridge, Montréal, Québec, CanadaThe Jacques Cartier Bridge was built in 1925 and spans over the St.Lawrence River and the navigation channel towards St.Helen's Island. Including 40 approach bridge spans the overall length of the structure is 3.4 km. After more than 78 years the existing deck had to be replaced by new precast concrete segments. The entire work had to be carried out at night after the bridge had been closed, since it was necessary to keep the bridge open for traffic during daytime. The strict overall schedule for the necessary construction and post-tensioning work presented a special challenge. DSI's services included the provision of the required material "just in time" and execution of the necessary post-tensioning work on the precast concrete segments. |